Description
Troy Lee Designs Flowline MTB Glove
The Troy Lee Designs Flowline MTB Glove is built for comfort, ventilation, and performance, offering a lightweight feel with essential protection. Designed and tested by top athletes, this glove ensures optimal grip and control while keeping your hands cool on every ride.
Key Features
- Adjustable Velcro Cuff – Secure and customizable fit.
- Single-Layer Palm – Mapped laser perforations for enhanced breathability.
- Micro-Mesh Construction – Maximum airflow for all-day comfort.
- Touchscreen Compatibility – Use your devices without removing your gloves.
- Sublimated Graphics – Stylish and durable design.
Perfect for trail, enduro, and downhill riders, the Flowline Glove delivers a balanced mix of comfort, protection, and performance for every ride.
Explore more from our collection.







Reviews
There are no reviews yet.