Sale!

Troy Lee Designs Flowline MTB Glove – Mono Collection – Steel Blue

Original price was: $35.00.Current price is: $23.33.

Quantity
SKU: N/A Category: Brand:

Description

Troy Lee Designs Flowline MTB Glove

The Troy Lee Designs Flowline MTB Glove is built for comfort, ventilation, and performance, offering a lightweight feel with essential protection. Designed and tested by top athletes, this glove ensures optimal grip and control while keeping your hands cool on every ride.

Key Features

  • Adjustable Velcro Cuff – Secure and customizable fit.
  • Single-Layer Palm – Mapped laser perforations for enhanced breathability.
  • Micro-Mesh Construction – Maximum airflow for all-day comfort.
  • Touchscreen Compatibility – Use your devices without removing your gloves.
  • Sublimated Graphics – Stylish and durable design.

Perfect for trail, enduro, and downhill riders, the Flowline Glove delivers a balanced mix of comfort, protection, and performance for every ride.

Explore more from our collection.

Additional information

Color

Steel Blue

Size

Small, Medium, Large, X-Large, 2X-Large

Reviews

There are no reviews yet.

Be the first to review “Troy Lee Designs Flowline MTB Glove – Mono Collection – Steel Blue”

Your email address will not be published. Required fields are marked *